RubyGems Navigation menu

critical-path-css-rails 0.1.0

Only load the CSS you need for the initial viewport in Rails!

Gemfile:
=

install:
=

Versions:

  1. 4.1.1 December 23, 2020 (21 KB)
  2. 4.1.0 April 29, 2020 (21 KB)
  3. 4.0.1 August 19, 2019 (21 KB)
  4. 4.0.0 August 19, 2019 (21 KB)
  5. 3.1.0 April 07, 2019 (20.5 KB)
  6. 0.1.0 September 19, 2015 (15 KB)
Show all versions (24 total)

Runtime Dependencies (1):

phantomjs ~> 1.9

Owners:

Authors:

  • Michael Misshore

SHA 256 checksum:

=

Total downloads 107,285

For this version 2,537

Version Released:

License:

MIT

Required Ruby Version: >= 0

Links: